Graphic Design

  • Home
  • About Us
  • Traditional
    • Using A Pencil
    • Sketching An Image
    • Shading
  • Digital
    • Using A Stylus
    • Manipulating An Image
    • 3D Effect
  • Contact Us
  • Terms and Privacy Policy

Bathroom Project is DONE!!

July 19, 2015 James Allene

Planning took about a year, intensive planning about 6 months. The tiles and mosaics are from Italy, the vessel bowl was made by a potter in Syracuse, the custom made counter top is actually concrete, made to look like leather and VERY heavy. We brought the garbage can back from Florence. The work, from destruction to completion, took a little less than 2 months.

US Building Consultants

Follow Us!

Follow Us on FacebookFollow Us on Google+Follow Us on TwitterFollow Us on InstagramFollow Us on PinterestFollow Us on YouTube

Recent Posts

  • Construction News – Construction Consultant of the Year Finalist 2016
  • Kissimmee Roof Consultants 321.214.7663
  • [CB16] Around the Web in 80 Hours: Scalable Fingerprinting with Chromium Automationby Isaac Dawson
  • castle clash hack amazon – amazon hack free stuff 2016 – hack your amazon fire tv
  • HESM&A, Inc. Consulting Engineers

Subscribes With Us

Copyright © 2021 · Daily Dish Pro Theme on Genesis Framework · WordPress · Log in